Requirements
Define the standard before you measure anyone against it
Turn what a role or program actually demands into published, versioned requirements, each with a source, an owner, and a clear flag for what is mandatory or critical.
Explore in the demoREADIVANCE™ Readiness · role, program, and initiative requirements
Requirement
v1 · PublishedRead-onlySource-checked delivery decision memo
Produce a decision memo that verifies claims against sources and records uncertainty.
- Category
- Practical capability
- Source authority
- Internal standard
- Flags
- Mandatory · critical
- Owner
- Taylor Nguyen
Version history
v1 published
Sep 1, 2026 · in force
v2 draft
Created only when edited
Cited by
4 baseline attempts · 5 snapshots
IllustrationSynthetic Harborline requirement, not a live customer standard.
How this works in an engagement
Your delivery leaders approve the role expectations. Accumentum works with them on drafting, scenarios, and review criteria within an agreed scope. The demo shows published standards; self-service authoring is planned. Confirm requirements and content ownership before assessment begins.
Review deliverables and responsibilitiesWhy it matters
Most readiness disputes start with a vague standard. When expectations live in slide decks, policy PDFs, and managers’ heads, nobody can say which version applied when a person was assessed, or what a later change means for evidence already collected.
Who uses it
Program and delivery leaders define what a role family or initiative requires. Content owners maintain the source. Employees see exactly which expectations apply to them. Executives see coverage without editing rights.
What it changes
One standard, stated plainly
Requirements are written as observable work, not job-description adjectives, so assessors, managers, and employees read them the same way.
Traceable to its source
Each requirement records where it comes from: an employer policy, an internal delivery standard, a client expectation, or a contract obligation the employer has identified.
History that holds up
Publishing freezes a version. Changes create a new version, so earlier evidence is always read against the standard that applied at the time.
Workflow
How it works
- 1
Describe the requirement as observable work, with its source authority and whether it is mandatory or critical.
- 2
Assign an accountable owner and, where relevant, a validity window such as an annual acknowledgement.
- 3
Publish. The version is frozen; assessments and evidence now point to it.
- 4
When the expectation changes, create a new version instead of rewriting the old one.
Baseline assignment
Client milestone recovery memo
Using only the synthetic source packet, write a decision memo recommending whether to re-baseline a delayed delivery milestone. Cite sources, flag uncertainty, and note what you would escalate.
Requirement
Decision memo · v1
Scenario
scn-memo · v1
Due
Oct 15, 2026
Participants
Assigned by Taylor Nguyen- Morgan Patel
- Avery Kim
- Jordan Hale
- Riley Chen
- Sam Okonkwo
Annotated example
Source-checked delivery decision memo
Produce a decision memo that verifies claims against sources and records uncertainty. Category: practical capability. Source: internal standard. Mandatory and critical. Published as version 1 in the AI-enabled TPM design partner pilot.
The same program also requires AI-output verification and escalation, plus an information-handling acknowledgement that expires after 365 days.
Changing a requirement without rewriting history
Explore in the demo
- Publishing freezes a requirement version; edits create a new version.
- Assignments, reviews, development plans, and snapshots cite the version they used.
- Earlier evidence keeps pointing to the earlier version.
Roadmap capabilities
- Side-by-side diff between a draft and the published version
- Downstream impact list: which assignments, plans, and snapshots depend on the old version
- Migration choices per change (keep, reassess, or grace period), with owner approval and rollback
- Requirement authoring interface
Capabilities
What is available today
“In the demo” means you can use it today in the product demo with sample data. “Planned” means it is on the roadmap and not yet built.
- Versioned requirements with source authority and ownerIn the demo
- Mandatory and critical flags; validity windowsIn the demo
- Immutable published versions, enforced on the serverIn the demo
- Requirement authoring, version diff, and downstream impact reviewPlanned
- Requirement import from role frameworks or HR systemsBy assessment
Inputs
A role family or program scope, requirement text, source authority, mandatory or critical flags, validity windows, and an accountable owner.
Outputs
A dated, versioned requirement set that assessments, development plans, and readiness records cite by version.
See requirements in context
Walk the synthetic Harborline program to see how this module connects to the rest of the readiness record, or talk to us about a scoped pilot.
